Luxury Vinyl Plank in Multifamily: What Actually Makes It Last
What makes LVP last in apartment units and corridors: wear layer, subfloor prep, moisture testing, acclimation, production pace and warranty, from a multifamily flooring contractor with 40+ years in the field.
Most of the luxury vinyl plank going into apartment buildings today is good product. Shaw, Mohawk, Tuff-Plank, Floor Folio, Spartan Surfaces, Trinity and others all make plank that can handle years of residents, move-outs and make-readies. We install what's specified, and we've installed a lot of it.
But the carton doesn't decide how long the floor lasts. The subfloor does. The acclimation does. The glue and the install do. Every one of those products has to be installed correctly to reach the life expectancy it was built for.
So this isn't an article about which plank to buy. It's about what has to be true for the plank you bought to last.
Glue-down or click: what we see in multifamily
In the multifamily segment, glue-down vinyl plank is more common than click. The reason is budget. When a project is under cost pressure, and most are, glue-down is where the spec usually lands.
Click, or floating rigid core, still shows up, and it plays by its own rules. Rigid core moves mainly with temperature, not humidity. That's why it needs an expansion gap: a quarter inch at walls and fixed objects, and three-eighths of an inch in larger areas. Leave the gap out and the floor has nowhere to go when the building heats up.
Wear layer: units are not corridors
Wear layer is measured in mils. A 12 mil wear layer is 0.3 mm. A 20 mil wear layer is 0.5 mm. And when you're trying to predict how long a floor will last, wear layer thickness tells you more than the total thickness of the plank.
One manufacturer suggests 20 mil for multifamily units, to reduce replacement at turnover. In high-traffic common areas, a 12 mil wear layer can show visible wear sooner than expected without proper care and maintenance.
Here's how we look at it.
In the units, a 6 or 8 mil wear layer is sufficient for an apartment finish. But it needs maintenance to get long life out of it. In the corridors, it only makes sense to install a thicker wear layer. That surface is what takes the beating. Every resident, every move, every cart.
So does 20 mil in the units pay for itself by the first turn? Potentially. But a good cleaning and a liquid wax application before turnover can remove or camouflage most surface scratch damage and leave an acceptable floor finish. That makes it a decision between two costs: more wear layer up front, or a maintenance step at every turn.
Either answer can work. Not planning for either one doesn't.
The job is won or lost on the subfloor
Before a carton is opened, the floor is already headed toward success or failure. The subfloor, a good float or patch compound to fill the holes and flatten the surface, and a good glue are all equally important. Skip one and the other two can't make up for it.
The flatness tolerance is 3/16 of an inch in 10 feet. Dips and humps beyond that can crack or separate click joints. Measure twice, cut once applies to the floor under the floor, too.
When a floor fails flatness, here's what we do. If it's a minor condition on a small area, we repair it, no questions asked. If it's a larger area or a more serious condition, we alert the superintendent and ask for the time and space to make the repair right, with a change order request if it's necessary. We'd rather have that conversation before the plank goes down than after.
Over poured gypsum, ASTM F2419 covers surface preparation and defers to the manufacturers' written instructions. We covered gypsum in detail in our guide to installing flooring over gypsum underlayment.
Moisture testing: who does it, and how many
Concrete gets moisture tested before we install. Under ASTM F710, the limit with in-slab probes is 75% relative humidity, and the flooring manufacturer's limit governs. If their number is tighter, their number wins.
ASTM F2170 sets how many probes: three for the first 1,000 square feet, and one for each 1,000 square feet after that.
On a TCF job, the crew foreman performs the test and the project manager logs the data. The person on the floor takes the reading. The person running the project keeps the record.
Acclimation is permanent, not temporary
Acclimation depends on the product. Some rigid core lines require none in normal conditions. Others ask for 48 hours. Room temperature should be 65 to 85°F before, during and after the install.
That last word is the one that gets missed. After.
Permanent acclimation of the material and the space is an absolute necessity for most flooring installations. Very few products don't require it. And acclimation follows the manufacturer's sheet, not the installer's habit. It isn't a choice the installer gets to make.
The most common failure we see starts exactly here: the space is acclimated for the duration of the installation, and then the air or the heat gets turned off. The floor was installed in one building and now has to live in another one. Right?
Our position is simple. A space that isn't appropriately and permanently acclimated for the finish material doesn't get that material installed until the condition is corrected.
What goes wrong after the floor is down
The other most common problem has nothing to do with the install. It's what happens on top of the new floor.
Debris from other trades. Dirt and mud from foot traffic. Appliances, countertop material, toilets and boxes pushed across the surface. Every one of those scratches a new floor, and every one of them happens on almost every job. Protecting the floor until turnover is part of getting the life out of it.
How long does one unit take?
That's a loaded question, because we don't do one unit at a time.
If one unit were done by itself, it could take as long as two days, depending on total square footage, the state of climatization, the condition of the floor receiving the new floor covering, and the allowed working hours. In a perfect world, one small unit that is completely ready for install can be done in one day.
But the work is a multistep process. So we work in several units at once and create a production flow. One unit a day gets you 5 units in a 5-day week. When we're allowed to work in several units at the same time, that becomes 20 to 25 units a week.
That's a scheduling conversation worth having early.
Sound between units
Between dwelling units, code requires STC and IIC ratings of 50 when lab tested, or 45 when field tested (IBC Section 1206). Designing the floor-ceiling assembly above the minimum is the smart move if you want to pass in the field.
But design is only one part of the equation. The assembly has to be installed correctly, per plan and spec, to keep the integrity the design intended. A good assembly on paper doesn't test well in the field if it wasn't built the way it was drawn.
What we stand behind
TCF carries a 12-month standard labor warranty. We support our installation for 12 months from the date of install. Material and product warranties are passed forward from the manufacturers.
That's another reason we follow the manufacturer's written instructions on moisture, acclimation and prep. Their product, their sheet.
The bottom line
LVP is a good floor for multifamily. It's durable, it's practical, and the products on the market today are built to last when they're installed right.
The plank is rarely the problem. What's under it, around it and on top of it decides everything.
Frequently asked questions: LVP in multifamily
What wear layer should LVP have in apartment units?
Is glue-down or click LVP more common in apartments?
What is the flatness tolerance for installing vinyl plank?
What moisture level is acceptable for LVP over concrete?
Does LVP need to be acclimated?
How many apartment units can a crew install per week?
What warranty does TCF provide on LVP installation?
Sources
- Wear layer mils and conversion: MSI
- 20 mil for multifamily; 12 mil wear in common areas: MSI
- Wear layer vs plank thickness: Flooret
- Flatness, F710 moisture limit: GCP on ASTM F710
- Temperature range: Flooret
- Click joints, expansion gap, rigid core movement, acclimation: Hardwood Bargains
- Probe count: Wagner Meters
- STC/IIC code: American Wood Council
- Gypsum prep: ASTM F2419
Owner & President. Leads overall strategy, operations, sales, financial oversight, personnel, and subcontractor management.